|

Project description:
- Liebherr to provide a robust, flexible, reeling power supply cable for a new STS installation in the port of Khorfakkan, UAE.
Customer challenges:
- Liebherr designs and builds highly reliable crane systems, and imposes rigorous quality standards.
- The port of Khorfakkan presents environmental challenges with high ambient temperatures and frequent sandstorms.
 |
Nexans solutions:
- Nexans' rigorous design, quality and testing parameters ensure that durable efficient products are available to meet Liebherr’s exacting standards.
- Nexans Rheyfirm (RTS) is designed to meet the extremely high mechanical stresses required by modern STS cranes operating at high speeds in harsh environmental conditions.
- Nexans unique design of reinforcement and rubber compounds ensures optimum flexibility, abrasion resistance and protection against high tensile and torsional loads during operation.
|
|
|

|